Announcement: $30 Billion Investment in Mahshahr Petrochemical Zone by the Persian Gulf Petrochemical Brokers Group

ارتباط با شرکت زرین پلاستیک نیلگون

۳۲۸۰۰۰۲۳-۰۲۶ - ۳۲۸۰۰۰۸۳-۰۲۶ number-call

موفقیت را به شما نشان میدهیم

پروژه ها

میزان پیشرفت

٪89

Improvement Plan for IRALCO Efficiency

مدت زمان: 360 days

نوع پروژه: Developmental

روش اجرا: EPC

This plan has been designed with the aim of enhancing efficiency and reducing operational costs at the Iranol Petrochemical Complex. Production efficiency will be improved through optimization of chemical processes and upgrading of key equipment. The installation of new catalysts in main reactors will result in a higher conversion rate of raw materials into valuable […]

مشاهده پروژه

میزان پیشرفت

٪48

Northern Project Improvement Plan

مدت زمان: 260 days

نوع پروژه: Constructive

روش اجرا: EPC

This project has been designed with the goal of increasing production capacity and improving the quality of petrochemical products in the northern region of the country. Considering the strategic location of this complex near gas resources and access to open waters, a comprehensive plan for developing new units has been prepared. Main Axes of the […]

مشاهده پروژه

میزان پیشرفت

٪68

Iranol Quality Improvement Plan

مدت زمان: 280 days

نوع پروژه: Developmental

روش اجرا: EPC

This plan has been designed to enhance efficiency and reduce operational costs at the Iranol Petrochemical Complex. Production efficiency is improved through optimization of chemical processes and upgrading of key equipment. Installing new catalysts in the main reactors leads to an increased conversion rate of raw materials into high-value products. Reconstruction of heat exchangers and […]

مشاهده پروژه

میزان پیشرفت

٪25

Northern Power Plant Optimization Plan

مدت زمان: 180 days

نوع پروژه: Developmental

روش اجرا: EPC

The optimization of the Northern Power Plant encompasses a series of strategic measures aimed at enhancing the performance and efficiency of the facility. Phase One: Thermal Efficiency and Fuel Optimization The first step involves improving fuel consumption and increasing the plant’s thermal efficiency through the installation of advanced heat recovery systems. These systems reclaim lost […]

مشاهده پروژه

میزان پیشرفت

٪78

Improvement Plan for IRALCO Efficiency

مدت زمان: 360 days

نوع پروژه: Constructive

روش اجرا: EPS

This plan has been designed with the aim of enhancing efficiency and reducing operational costs at the Iranol Petrochemical Complex. Production efficiency will be improved through optimization of chemical processes and upgrading of key equipment. The installation of new catalysts in main reactors will result in a higher conversion rate of raw materials into valuable […]

مشاهده پروژه

میزان پیشرفت

٪100

Northern Petrochemical Project Plan

مدت زمان: 280 days

نوع پروژه: Developmental

روش اجرا: EPD

This project is designed to increase production capacity and improve the quality of petrochemical products in the northern region of the country. Given the strategic location of the complex—close to gas resources and with access to open waters—comprehensive planning has been undertaken for the development of new units. Main Components of the Plan:Construction of an […]

مشاهده پروژه